    Hi All,
    I have been testing 2x ver 12 and everything is great so I plan on migratiing. Here is my current setup:

    Current Version of 2x = 5.1
    Two Internet Service Providers. One for each Load Balancer.
    Two 2x load Balancers connected to Two 2x Terminal Servers Connected to One 2x DB File Server.
    All Servers Except the DB File Server are Windows 2003. The DB FIle Server is 2008sp2.
    My test server is running 2x ver 12 on Windows 2012 and is connected straight to the DB File server right now. With no load balancing.

    My Plan is to Upgrade all the 2003 Servers to 2012 and go from 2x version 5.1 to 12.
    So the Questions
    Do I still need 5 Servers?
    What is the Best method to do this?
    I have the 2x ver 12 on the same Farm as the 5.1 but it's telling me I need to update agents. If I do that will it cause trouble for me?
     