Poor performance with MSProject on Windows 10

AlainV2

Bit poster
Hi
first of all the framework:
Host:
Model Name: MacBook Pro
Model Identifier: MacBookPro16,1
Processor Name: 8-Core Intel Core i9
Processor Speed: 2.3 GHz
Number of Processors: 1
Total Number of Cores: 8
L2 Cache (per Core): 256 KB
L3 Cache: 16 MB
Hyper-Threading Technology: Enabled
Memory: 64 GB
Boot ROM Version: 1037.147.4.0.0 (iBridge: 17.16.16610.0.0,0)

Guest:
2 processors w/ adaptive hypervisor (Parallels),
2Gb RAM,
1Gb graphic memory, DirectX10 for 3D-acceleration and vertical sync on,
disk capacity 256Gb, Windows 10Pro 64bit 10.0 (19041.450)

Parallels edition:

Desktop 16 for Mac v. 16.0.1 (48919)
VM resolution is set to "Scaled"
Microsoft Office: MSProject 2016 + Office 365

  1. First strange thing, when I show "About Microsoft Project" it shows : Parallel Desktop for Mac Home Edition 15.1.2(47123)
  2. Excel, Word and powerPoint are running normally. Ms project is a nightmare. Let say I want to delete a baseline in a 1000 lines plan, it takes minimum 10 minutes to do it. This kind of action should be instant.
Any word of advice? Thanks.
 
Hi,

I do experience exactly the same issue. Reinstallation did not change anything. I even have a strange issue, when I try to change the level of an activity (let say from 10.1 to 10.1.1) it runs then stop and nothing has changed. When I do it it my job computer, windows one, it works perfectly.

Any advice ?

Alain
 
Back
Top