Pardon me, but I'm getting moaning messages about the 15-day trial license expiring on Sept 22nd, yet only with the latest 1896.2 build has this Beta been barely stable enough to evaluate on my Mac Pro.
Wouldn't it make more sense to code these Betas with a hard expiry date, and leave the trials to stable, non-Beta kits?
Wouldn't it make more sense to code these Betas with a hard expiry date, and leave the trials to stable, non-Beta kits?